Jan 13 By admin σμοκ
Designed works include: A main water intake steelpipe is 2500mm, combined with a hydroeletric power…
Jan 12 By admin gadouras-ext3
The project involves the extension of the existing pipeline to a wider area, covering potable water…
Jan 12 By admin serres-1
This project is part of the reallocation plan for the plain.
Jan 11 By admin stylida-1
The stormwater and drainage works design of the 180km2 basin refer to : The main highway, 19.235 km long
Jan 11 By admin pikermi-1
Main and secondary sewer network design.
Jan 11 By admin kalyvia-1
Design of an ~118Km extension sewer network.