Highway, junction, overpass, underpass, bridge and tunnel stormwater and drainage systems design.
This section is part of the New National Higway upgrade (ΠΑΘΕ) and will facilitate the connection of Ag.Marina, Stylida, Karavomilos, Ahinos, Avlaki and Raches settlemets


The stormwater and drainage works design of the 180km2 basin refer to :
- The main higway, 19.235 km long
- Three (3) tunnels,
- Four (4) valley bridges,
- One (1) bridge (Vellias stream)
- Three (3) overpasses
- Eleven (11) underpasses.
- Three (3) interchanges : (α) Ag. Marinas - Stylidas(β) Stylidas - Karavomilou (γ) Karavomilou - Ahinou.
- Sideways and other local roads
- Temporary works during construction period.

Quick Start





Follow Us

LinkedIn icon
YouTube icon

Contact Us

3 Evias Str. 15125, Maroussi,
       Athens, Greece

  +30 2108064543

  +30 2108055495


© Copyright 2013. Hydroexigiantiki Consulting Engineers Back to Top

Back to Top