Deprecated function: Array and string offset access syntax with curly braces is deprecated in include_once() (line 20 of /home/nkhzvhup/public_html/includes/file.phar.inc).
The project comprises of 5 discrete phases:
- Data entry and processing
- Software and equipment supply for web operation
- Automatic Telemetric Meteorogical Station Network
- Locate position using GPS
- Consulting and Project Management - Technical Suppport - Capacity Building
This study was separated at three phases. The documents required at each phase were: A Phase
- The identification of appropriate competent authorities
- Register of protected areas
- Economic analysis of water uses. Recovery of the costs of water services including environmental and resource costs
- Alternative proposals of flexible water pricing policies
- Characterisation and typology of surface water bodies. Initial and further characterisation of groundwater bodies.