Study for the design of the dam, in order to ensure water availability for the operational purposes of the Porto-Carras resort complex
The project includes the dam, spillway and energy dissipation, water intakes and road access. The dam and reservoir lies within the private Porto-Carras areas. The main structures are: - a lean RCC dam with a height of 32m and volume ~40.000 m3 - a spillway with capacity 330m3/s - a 4 level water intake structure The reservoir has total capacity ~1.000.000m3
Feasibility/Prelimenary study. - Evaluation of alternative solutions - Cost - efficiency evaluation - Hydrological study - RCC dam and appurtenat structures design
The most up to date lean RCC technology specifications were applied for this project . In the design process, several modern IT tools were used, such as advanced hydrological modeling, CAD and GIS, hydraulic calculations, etc. Several issues such as RCC mixture specifications had to be considered.
Sitemap
Careers
Profile
Search
3 Evias Str. 15125, Maroussi, Athens, Greece
+30 2108064543
+30 2108055495
info@hydroex.gr
Cookie & Privacy Policy
© Copyright 2013. Hydroexigiantiki Consulting Engineers Back to Top
Back to Top