Highway design for the update of the New National Road into a Highway (ΠΑΘΕ), section: Stylida - Raches (Chainage 12+000 - 32+000)

Error message

Deprecated function: Array and string offset access syntax with curly braces is deprecated in include_once() (line 20 of /home/nkhzvhup/public_html/includes/file.phar.inc).
Printer-friendly versionPDF version
Project description
Scope: 

Highway, junction, overpass, underpass, bridge and tunnel stormwater and drainage systems design.
This section is part of the New National Higway upgrade (ΠΑΘΕ) and will facilitate the connection of Ag.Marina, Stylida, Karavomilos, Ahinos, Avlaki and Raches settlemets

Description: 

The stormwater and drainage works design of the 180km2 basin refer to :
- The main higway, 19.235 km long
- Three (3) tunnels,
- Four (4) valley bridges,
- One (1) bridge (Vellias stream)
- Three (3) overpasses
- Eleven (11) underpasses.
- Three (3) interchanges : (α) Ag. Marinas - Stylidas(β) Stylidas - Karavomilou (γ) Karavomilou - Ahinou.
- Sideways and other local roads
- Temporary works during construction period.

Quick Start

   Sitemap

    Careers

   Profile

   Search

Follow Us

LinkedIn icon
YouTube icon

Contact Us

3 Evias Str. 15125, Maroussi,
       Athens, Greece

  +30 2108064543

  +30 2108055495

  info@hydroex.gr

© Copyright 2013. Hydroexigiantiki Consulting Engineers Back to Top

Back to Top