Potential failure mechanisms (overtopping and piping) were considered. 1D and 2D flood wave propagation were modelled. Inundation maps were produced in order to consider the consequences and the evacuation safety plan. An EAP was implemented considering the dam break analysis results
Potential failure mechanisms (overtopping and piping) were considered. 1D and 2D flood wave propagation were modelled. Inundation maps were produced in order to consider the consequences and the evacuation safety plan. An EAP was implemented considering the dam break analysis results
General Planning of the Sewer Network. General Planning of the determination of upgrade works needed at the existing Wastewater Treatment Plant. Final Design and Tender Document preparation of parts of the sewer network of the Karditsomagoula and Artesiano areas in the Municipality of Karditsa. Environmental Assessment Study
Consultant for assisting DEYAK in the preparation of the application file and the submition of the relevant application for funding of the Treatment and Disposal of Sewage Sludge works of the Wastewater Treatment Plant (WWTP) of the Municipality of Karditsa. General plans and basic design plans of proposed works. Assistance in Project Data documentation (scope determination, losses estimation report etc).
The Technical Consultant assisted in:
Consultant for assisting DEYAMV in the assesment of current water supply situation in N. Ionia area, water network zoning and calculations, water network separation in water losses control zones (District Metered Areas – DMAs). Control stations and relevant equipment determination. General plans and basic design plans of proposed works. Assistance in Project Data documentation (scope determination, losses estimation report etc).
Consultant for assisting DEYAMV in the assesment of current water supply situation, water network zoning and calculations, water network separation in water losses control zones (District Metered Areas – DMAs). Control stations determination. Master Plan of proposed works.